
New build office for warehouse Goods Out Team in Monmouth.
- The project required existing doorways in a stud partition blocking before the new build commenced.
- Stud and plasterboard construction was used in a tape and joint finish that was then given three coats of emulsion.
- A self supported ceiling was installed in the office with a 600mm x 600mm ceiling tile.
- An oak veneer door was installed and single window.
- The project was finished on time and on budget
Contact Advantage Storage and Handling today to find out how we can transform your space!