Double Mezzanine & Fit Out, Gloucester

Turnkey Mezzanine & Fit Out Project, Gloucester

Complete design and build of a double fire rated mezzanine floor in Gloucester designed for storage and offices.

  • Mezzanine floors were 76m2 and 36m2.
  • Full CAD/CAM design with structural calculations.
  • Before installation began, we sealed the floor and laid an epoxy floor coating.
  • Upon design sign off, manufacturing was quickly undertaken and steelwork erected over several days.
  • Once the structure was built, it was ’fire rated’ and suspended ceiling installed to comply with Building Control Regulations.
  • We then knocked through the wall between buildings and created a new fire exit joining the two mezzanines.
  • Open plan offices were built using stud and plasterboard in a tape joint and emulsion finish and carpets laid.
  • A glass feature wall was installed on the mezzanine edge providing a panoramic view of the factory
  • Building control approval was undertaken by Advantage making the end to end process extremely straight forward for the customer.
  • All our mezzanines are provided with CE mark certification and full loading and structural calculations.