Complete design and build of a double fire rated mezzanine floor in Malvern designed for storage. To include Pallet safety gate and refurbishment of toilets.

  • Mezzanine floors were 108m2 and 199m2.
  • Full CAD/CAM design with structural calculations.
  • Before installation began, we removed an existing wooden structure then sealed the floor of the build area and laid an epoxy floor coating.
  • Upon design sign off, manufacturing was quickly undertaken and steelwork erected over several days.
  • Once the structure was built, it was then ’fire rated’ and suspended ceiling installed to comply with Building Control Regulations.
  • Building control approval was undertaken by Advantage making the end to end process extremely straight forward for the customer.
  • All our mezzanines are provided with CE mark certification and full loading and structural calculations.
  • The project was finished on time and on budget