Complete design and build of a mezzanine floor in Cirencester designed for mixed classroom and storage use.
58m2 mezzanine floor
Full CAD/CAM design with structural calculations.
Designed to fit above an existing showroom area.
Upon design sign off, manufacturing was quickly undertaken and steelwork erected over several days.
Once the structure was built, it was then ’fire rated’ and suspended ceiling installed to comply with Building Control Regulations.
The classroom was then built on top of the mezzanine using stud and plasterboard with insulation in the cavity. Windows and door installed along with the suspended ceiling.
Building control approval undertaken by Advantage making the end to end process extremely straight forward for the customer.
All our mezzanines are provided with CE mark certification and full loading and structural calculations.