This Gloucestershire-based distributor needed to double the available space of their warehouse unit. With an existing ground floor shelving store already in operation, Advantage needed to carefully plan mezzanine column positions to suit this layout, minimising any reduction in the existing ground floor storage.
The following project schedule was followed:
- Raising existing lighting
- Building mezzanine
- Knocking through new fire rated door
- Fire rating mezzanine
- Installing new ground floor lighting
The project was completed within the agreed timescale with a week to spare prior to the client receiving its new product lines.