This 120m2 storage mezzanine floor was built in just 2 days. Designed to suit ground floor shelving to be installed as a second phase, the columns were spanned 7 metres in the one direction.
To maximise storage space, yet comply with Building Control, the staircase was located centrally with a triple flight and mid landing.
The photograph illustrates the standard black kicker/fascia, powder coated handrail posts, chequer plate stair treads and galvanised horizontal handrailing supplied on a standard Advantage Storage mezzanine floor.
Contact Advantage Storage and Handling today to find out how we can transform your space!