Turnkey Mezzanine & Fit Out Project, Cirencester
- Complete design and build of a mezzanine floor in Cirencester designed for mixed classroom and storage use.
- 58m2 mezzanine floor
- Full CAD/CAM design with structural calculations.
- Designed to fit above an existing showroom area.
- Upon design sign off, manufacturing was quickly undertaken and steelwork erected over several days.
- Once the structure was built, it was then ’fire rated’ and suspended ceiling installed to comply with Building Control Regulations.
- The classroom was then built on top of the mezzanine using stud and plasterboard with insulation in the cavity. Windows and door installed along with the suspended ceiling.
- Building control approval undertaken by Advantage making the end to end process extremely straight forward for the customer.
- All our mezzanines are provided with CE mark certification and full loading and structural calculations.
- The project was finished on time and on budget
Contact Advantage Storage and Handling today to find out how we can transform your space!